Project Details
 
Name of Project: 35W Bridge Reconstruction
Location: Minneapolis, MN
Scope of Work: Utility Installation

On August 1st, 2007 the I-35W Bridge a major artery for traffic in the metropolitan Twin Cities, fell into the Mississippi River during the evening rush hour. Tragically, 13 people were killed and 100’s more were injured.

The bridge carried more than 140,000 vehicles a day. And, the loss of the bridge costs the City of Minneapolis $400K everyday. It is for both those reasons that the rebuilding of the bridge is on an accelerated time schedule. The bridge is projected to be complete by late December 2008.

As a women owned small business, Meyer Contracting has been privileged to be a part of the rebuilding process. The bridge will be two lanes wider than the former bridge, therefore requiring the movement of underground utilities in downtown Minneapolis. Meyer Contracting will be performing all utility relocation work and the installing a storm retention system called: Ecostorm. Meyer Contracting has also been asked to install a box culvert for a pedestrian tunnel under the bridge.  The box culvert will be the biggest in the State of Minnesota.
 